Friday, April 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

FEC approves N49bn revised sum for Enugu-Anambra link road

Gbemi Banks by Gbemi Banks
April 12, 2023
in News, Services
0

The Federal Executive Council (FEC) has approved the sum of N49 billion being the revised sum for the old Enugu-Onitsha road project.

The Minister of Works and Housing, Babatunde Fashola, briefed State House correspondents after FEC meeting presided over by Vice President Yemi Osinbajo on Wednesday at the Presidential Villa, Abuja.

Fashola said his ministry sought and obtained two approvals from the council.

“We presented two memoranda to council; both were approved; the first is with regards to contract cost revision by way of augmentation for the old Enugu-Onitsha road from Opi junction all the way to Udi-Oji to Anambra border in Enugu State.

“The augmentation was in the sum of N17 billion which revised the contract sum to N49 billion with an additional completion time of 42 months.’’

The minister said that the second contract was a fresh contract for the maintenance of the pavement of the third mainland bridge.

He said that maintenance would address public concerns on the presence of potholes on the bridge.

“And this was approved in the sum N6.3 billion for a period of 24 months.

“This is consonance with the Executive Order 11 signed by the president for the continued maintenance of public infrastructure.

“This contract responds to the questions on potholes that have become manifest on the entire pavement of the deck of the bridge spanning 11 eleven kilometers and the interchanges—Adeniji Adele, Adekunle and Gbagada ramps that all link the bridge; this is for the resurfacing of all that.

“Those who are familiar with the bridge will recall that all of these failures were not this manifest on the bridge as at the time we did some work; and the work that we did concentrated largely on the sub-structure of the bridge—the piles, the underwater piles; the pile caps and also the replacement of the expansion joints and the bearings.’’

According to him, the maintenance works are critical to the structural integrity of the bridge.

He said that the maintenance work would restore the driving surface and the aesthetics.

“Some of the rails that have been stolen; some of the planes that have misaligned at the ramps that lead you on and off the bridge.

“So, this is the work that is being done now; so all the experience, avoiding potholes on the bridge; this project will tackle that,’’ he said.

Tags: Adeniji AdeleBabatunde Fasholafec
Previous Post

Activity resumes in Ethiopian region after deadly protests

Next Post

10 people die in migrant boat accident off Tunisian coast

Next Post

10 people die in migrant boat accident off Tunisian coast

EFCC

EFCC arrests 11 alleged internet fraudsters in Maiduguri

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

Why Tinubu addressed victims of Plateau attack at airport – Presidency

April 3, 2026
Tinubu and Yilwatda

Yilwatda: Plateau must never bleed again

April 3, 2026

WELA Requests Update On Alleged Sexual Violence in Delta, Calls for Ban on ‘Raping Festival’

April 3, 2026
Amupitan

INEC dismisses calls for Chairman’s removal, clarifies misconception over voter revalidation

April 2, 2026

APC to ADC: You are the architect of your misfortune

April 2, 2026

Adelabu’s Power Lines as Laundry Lines – Azu Ishiekwene

April 2, 2026

Why 57 properties linked to Malami should be permanently forfeited to FG – EFCC

April 2, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.