Friday, April 3, 2026
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
  • Home
  • News
    • Foreign
    • Crime
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates
No Result
View All Result
Freedom Online
No Result
View All Result

Apapa Marine Beach Bridge to be closed for 29 days

Femi Adewale by Femi Adewale
April 6, 2017
in News
0
Lagos gridlock: Truckers decry brutalisation, extortion by security operatives, area boys

Lagos gridlock: Truckers decry brutalisation, extortion by security operatives, area boys

The Apapa-bound carriageway of the Apapa Marine Beach Bridge will be closed on Friday for 29 days in its ongoing rehabilitation, the site Manager, Mr Simon Barakat, has said.
Barakat, who spoke on site on Thursday, appealed to road users to be patient and use alternative routes.
“We will close the Apapa-bound carriageway on Friday evening, and it will remain closed up till May 8.
“We appeal to road users to slow down in this area and be more careful to use the diversions and respect traffic signs to check gridlock.
“Truck owners should avoid breakdowns within this period by maintaining their vehicles regularly,’’ he said.
Barakat, a Senior Engineer with Buildwell Plants and Equipment Industries Ltd., the contractors handling the project, said that two major diversions had been created to avert gridlock.
The manager said that the repair done on the Ijora/Lagos-bound carriageway was being replicated on the Apapa-bound carriageway, adding that foundation works under the bridge had been completed.
“We are marking, cutting and doing the preparation to start post tensioning of the bridge; this gives strength to the bridge.
“We have to demolish the bridge to fix the cables and cast concrete on it again to prepare it for the next stage of construction which will be installation of bearings,’’ he said.
He said that after the 29 days, the next stage of repairs would be replacement of bearings on both carriageways which, he said, would take 40 days on each side.
Mrs Bola Suleiman of the Federal Ministry of Power, Works and Housing, an engineer supervising the project, said that all the traffic management agencies had been mobilised to ensure free flow of traffic during the closure.
“The traffic management agencies are all aware; we made the decision together at our stakeholders’ meeting; they will divert traffic coming to Apapa through Ajegunle and Mobil Road,’’ she said.
Suleiman said that the ministry was filling potholes on Burma Road to ease traffic.
The Marine Beach Bridge was damaged by fire about 10 years ago.
Contract for repair of the bridge was awarded in 2012, but the contractor abandoned the project due to funds constraint.
The contractor moved back to site on March 5 to begin the repair works.
The Ijora/Lagos-bound carriageway was opened to light traffic on March 26 after the first phase of work was done on the carriageway.

Tags: apapa marine bridge
Previous Post

Court orders final forfeiture of Naval boss’s N1.83bn to FG

Next Post

Niger Assembly orders probe of Magistrate over light sentence for rape

Next Post
Man arraigned for beating mother-in-law, injuring her

Niger Assembly orders probe of Magistrate over light sentence for rape

dalung

Sports Minister meets Buhari on World Cup qualification, others

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

https://freedomonline.com.ng/wp-content/uploads/2025/01/5aeac180-db4e-4e7c-bd37-07ddbf15b053.mp4

Popular Stories

Plugin Install : Popular Post Widget need JNews - View Counter to be installed

Latest Stories

ADC

No Retreat, No Surrender! ADC defies INEC, vows to go ahead with congresses, convention

April 3, 2026

Why Tinubu addressed victims of Plateau attack at airport – Presidency

April 3, 2026
Tinubu and Yilwatda

Yilwatda: Plateau must never bleed again

April 3, 2026

WELA Requests Update On Alleged Sexual Violence in Delta, Calls for Ban on ‘Raping Festival’

April 3, 2026
Amupitan

INEC dismisses calls for Chairman’s removal, clarifies misconception over voter revalidation

April 2, 2026

APC to ADC: You are the architect of your misfortune

April 2, 2026

Adelabu’s Power Lines as Laundry Lines – Azu Ishiekwene

April 2, 2026
Freedom Online

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.

Navigate Site

  • Home
  • News
  • Business
  • Politics
  • Health
  • Entertainment
  • Interview
  • Sports
  • Ad Rates

Follow Us

No Result
View All Result
  • #13921 (no title)
  • Advert Rates
  • APC ad
  • Archive Sitemap
  • Contact
  • Contact Us
  • Documents
  • Full Width
  • Homepage
  • Ogun State
  • Ogun State banner ad
  • P-A
  • P-A2
  • Privacy policy
  • Sample Page
  • Sample Page
  • Submit an article
  • Welcome

© 2026 Published by SWAAYA LIMITED, Plot 20, Block G, Scheme 1, Residential 3, OPIC Beachland Estate, Lagos/Ibadan Expressway, Lagos. Gabriel Akinadewo, MD/CEO 08023010222, 08094000056, 08052097814.